
02
Factory Route
Build Reliable Automation
Start with a controllable lane, then use it to protect long combo attempts.
Follow the Route
Read these guides in order.
Each step builds on the last. Start at the top and work your way down.
01
02
Factory SystemsHow to Automate Phase 4 in Project P.I.T.T.Phase 4 automation hub: three-input staging, 1.0.7 Pistons, Piñata protection, Shift Scheduler, Trade Terminal, Panel Rack, and Anomaly Phase 4 cross-links.Read guide →

Shift SchedulerProject P.I.T.T. Shift Scheduler: how to use it, Duck Crank blockUpdated for 1.0.6: Use Project P.I.T.T. Shift Scheduler to schedule automatic or switchable tools; it will not act as a button for the Manual Duck Crank. Re-test old reports.Read guide →
03Trade TerminalHow to Use the Trade Terminal in Project P.I.T.T.Updated for 1.0.7 — Use the Project P.I.T.T. Trade Terminal to vacuum scene items; long-press the tool lever to wipe placed tools. Right-side switch vacuums; Pause Menu Clear Items is emergency fallback (no refund).Read guide →
04Panel RackHow to Use the Panel Rack in Project P.I.T.T.Updated for 1.0.7: bind the interact key on Panel Rack, use the auto dispense toggle, and understand how dispensing differs from 1.0.6 manual-only behavior.Read guide →
05Phase 4 AnomalyHow to Make Anomalies in Project P.I.T.T. — Phase 4 Recipe & Workbench FixesPhase 4 recipe, workbench fixes, and Piñata staging tips for making Anomalies in Project P.I.T.T.Read guide →
06Combo MilestonesHow to Get a 300 Combo in Project P.I.T.T. — x300 Achievement GuideOperational steps to earn the MEGA! x300 combo in Project P.I.T.T.: build one reliable feed lane with a short visible recoverable section, keep product arrival continuous, test MORE! x100 and EXTRA! x200 runs first, use Automation and the Shift Scheduler to maintain flow, and time the final attempt before any ending progression.Read guide →
